Decoration is a torment. How many people have lost their skin after decoration. Why is decoration so tiring? You have to buy decoration materials, focus on construction, and finally have to check and accept, especially focusing on construction. A project takes several months. It's strange not to peel off the skin at this time. In fact, focusing on construction doesn't have to be so hard. It's good to grasp several decoration nodes, so which nodes do we have to be present

decoration is a torment. How many people have lost their skin after decoration. Why is decoration so tiring? You have to buy decoration materials, focus on construction, and finally have to check and accept, especially focusing on construction. A project takes several months. It's strange not to peel off the skin at this time. In fact, focusing on construction doesn't have to be so hard. It's good to grasp several decoration nodes, so which nodes do we have to be present

first, the mobilization disclosure must come

before the decoration of the house, the owner, designer and construction team leader should communicate. In short, it is generally necessary to ensure the contents of three aspects to lay a foundation for later work. First, it is necessary to confirm the design scheme of the house, such as clarifying where pipes need to be arranged and what needs to be done, so as to know well. Second, we should determine the trend of hydropower and coal. Third, it is necessary to determine the changes in the structure of the house, which requires good communication with the construction team and designers. On the one hand, we should know well, and on the other hand, we should lay a good foundation for future projects

on the first day when the workers enter the site, the designer explains to the construction team leader how to construct, including many details. If the owner has doubts, he can immediately put forward it and get it corrected

second, the electricity pipe wiring must arrive

the owner should go to the site to have a look before the water and electricity lines are sealed. Mainly to ensure three aspects. First of all, the capacity of the wire should not be greater than 40% of the pipe, which is clearly stipulated in the 3.15 standard. Secondly, it should be noted that strong and weak electricity should not be threaded in the same pipe. For example, computer network cable and wire should not be threaded in the same pipe. If such a situation occurs, it will not only affect the normal operation of the computer, but also may trigger a safety accident. Finally, it should be checked that there should be no concave place at the turn of the sleeve, because if there is a concave place, the wire is difficult to pass through

the layout of wire pipes and water pipes should be as horizontal and vertical as possible. Strong and weak current pipelines must be separated ≥ 750px。

third, materials must arrive at the site

in this link, it is necessary to check whether the materials on the decoration budget are consistent with the materials sent to the site. During the owner's investigation, the owner often reflects the wrong delivery of materials. The owner carefully checks the brand and quality. If it is found when it is needed, it will bring unnecessary trouble to both parties

for the newly arrived wall waist bricks, not only the brand and model should be checked, but also the brick quality should be inspected to see whether there is color difference

fourth, the water pipe pressure test must be carried out until

after the water pipe is connected, because it is not clear whether there is leakage at the welded interface, it is necessary to conduct a hydraulic test. This test is very necessary, because only after the hydraulic test can we ensure that there will be no water leakage in the future, and then we can be relieved of this part. The PPR water pipe commonly used in your home now is 1.5 times higher than the daily water pressure. After an hour, no water leakage is found, and the water pressure is basically not reduced before it is qualified

water pipes are also an important part of concealed works. After passing the acceptance, the water pipes will be sealed immediately. In case of missing, there will be no chance to remedy in the future

fifth, when making the ceiling structure, we must first check whether the fulcrum of the ceiling around the wall is firm. Then it is necessary to determine whether the wood keel has been treated with fire prevention and corrosion prevention. Because there are wires, electrical appliances, transformers, etc. hidden in the ceiling. In case of electric leakage and fire, it will cause combustion, so you should see it clearly by yourself

the structure of the ceiling is not simple. It hangs above our heads every day. We must ensure its quality and safety. The suspender of the ceiling and the top surface are fixed with hammer type beauty nails (without the construction method of wood tenon + wood wire), so that the ceiling is safe and firm

sixth, the installation of gas must go to the link of

. First, check whether the gas leaks after installation. The second is to check that the gas position cannot be too close to the wire, otherwise the accidental electric spark may cause an explosion

as the shower is the intersection of water, electricity and coal, the temperature will rise and fall sharply during use, so it must not be taken lightly

warm tips: for more practical decoration knowledge and follow-up photos of real scenes on the construction site, please pay attention to your palm (wechat: mall_jia)